Testing
Safety is a key priority at HTL and to ensure that all equipment meets the stringent requirements that currently exist.
T: 08000 832 202
Dialling from outside the UK:
+44 1670 700000
E: [email protected]
or click here for details
Safety is a key priority at HTL and to ensure that all equipment meets the stringent requirements that currently exist.
An HTL 110V electric pump unit being PAT tested prior to despatch.
Electrical safety is a key priority at HTL and to ensure that all electrically powered equipment meets the stringent requirements that currently exist, we have invested in 2 PTA testing units. This ensures that even when one machine is temporarily returned to the manufacturer for re-calibration, the company maintains full coverage in this area. Contact our service department to discuss your PAT testing requirements.
Accurate hand/arm vibration information relating to all types of equipment is a necessity and this limits any potential over exposure to excessive and harmful hand/arm vibrations.
We offer both in-house and on-site measurement of your equipment and can tailor test packages to suit customers. We ensure that all necessary equipment is regularly tested.
A 100 ton SPX Powerteam single-acting, spring-return cylinder. It is being tested, prior to rental, by HTL’s 200 ton test press.
Frequent load tests are required for all manner of lifting equipment, including hydraulic cylinders and jacks. HTL have four in-house test presses, ranging from 10 ton to 200 ton sizes. This allows for safe, controlled and accurate testing of a wide variety of these types of products. Upon successful completion of product testing, a dedicated certificate is issued for each piece of equipment, to document its compliance with regulations.
A 20 ton SPX Powerteam centre hole cylinder being tested, prior to delivery, on HTLs 60 ton test press.
Frequent load tests are required for all manner of lifting equipment, including hydraulic cylinders and jacks. HTL have four in-house test presses, ranging from 10 ton to 200 ton sizes. This allows for safe, controlled and accurate testing of a wide variety of these types of products. Upon successful completion of product testing, a dedicated certificate is issued for each piece of equipment, to document its compliance with regulations.
A hydraulic jack being tested on our 60 ton test press
A SPX Powerteam cylinder being tested on our 25 ton c-frame test press.
A Duff Norton mechanical jack being tested on our 10 ton test press.
The Company
|